It sounds like things are falling into place with the remodel.
3/17-Paint kitchen and new entry way
3/19-Windows in the living room
3/21-Cabinets installed into the kitchen
3/23-Demo the bathroom
3/24-plumber comes to redo the bathroom and my father-in-law and Chad will start laying the ceramic tile in the entry way, kitchen, hallway. Rinish up with bathroom (paint, install cabinets etc)
3/28-living room carpet installed
3/31-HOPEFULLY my father-in-law will be able to come back out and tile the bathroom.
AND THEN MY HOUSE WILL BE DONE.... doesn't the plan look all nice and pretty on "paper".... Here is to hoping that well... it stay nice and smooth....
Kristin
No comments:
Post a Comment